Project: Bovine-RV14A   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Jeff Lawson   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:601.5
Total Flight Time:
Start/Last Date:Jan 28, 2022 - No Finish Date
Engine:Lycoming YIO-390-EXP119 non-cert
Propeller:Hartzell G2YR/N7605W-2X 74 in. dia composite 2-blade
Panel:Dynon Skyview
 
Friendly URL: https://eaabuilderslog.org?s=Bovine-RV14A

Home or Last Project Picture

Feb 07, 2023     Nutplate prep for right spar - (2.0 hours)       Category: Wings
Tonight's session started with deburring all of the holes in the J-channel stiffeners that I had drilled last night. I also deburred a couple of the edges, and then labelled these parts and set them aside for now.

Next was to prepare to install all of the nutplates on the right wing spar. First all of the rivet holes for the nutplates had to be countersunk so that a flush rivet could later be installed. My countersinking drill stop cage made preparing all of those holes easy and consistent. I also treated all of the exposed surfaces from the countersinking with an Alodine pen to reduce future corrosion. Then I located the appropriate nutplates and temporarily cleco them in place, since there were several different part numbers needed for all of the spots.

What's next? Tomorrow will be time to start squeezing the rivets for all of these nutplates and countersinking their screwholes.


 